The Florida Department of Transportation (FDOT) is currently overseeing two design projects along SR-9 Interstate 95 in Palm Beach County, Florida. These projects aim to improve the interchanges at Gateway Boulevard and Boynton Beach Boulevard, including enhancements to the surrounding roadways. The Project Development Environmental Study (PD E) for both projects has been approved by the Federal Highway Administration (FHWA), and the projects have been divided into separate phases for design and construction.
With a commitment to consistency, predictability, and repeatability, the FDOT is dedicated to enhancing transportation infrastructure in Florida. By undertaking these design projects, the FDOT aims to improve the flow of traffic and enhance the overall travel experience for residents and visitors in Palm Beach County. Through collaboration with various stakeholders, the FDOT strives to create efficient and safe roadways that meet the needs of the community.
Generated from the website